Rates
Optional Rate for 100% Renewable Energy
- Monthly Base Charge – Charged according to Rate Class
- Energy Charge (All kWh) – $0.90 per 100 kWh Block
| Fee Description | Amount | Comments |
|---|---|---|
| Billing/Office Fees | ||
| Convenience Fee | 3% | Used on Impact Fee and Work Order credit card payments only. |
| Late Payment Charge(Compounded) | 1.50% | Applied on any past due amounts |
| Returned Payment Charge | $15 | Included in current schedule |
| Reconnect Fee | $20 | Included in current schedule |
| Service Application Fee | $20 | Included in current schedule |
| Seasonal Disconnect Fee | $50 | Included in current schedule |
| Construction Fees | ||
| Impact Fee | Amperage Calc. | Included in current schedule |
| Line Extension/New Development – Installation/Additional Design | Bid Estimate | Estimate for Labor, Materials, and Overhead provided upon request |
| Initiation/Will Serve Fee | $200 | Check only |
| Design Fee | $300 | This is a per development phase fee |
| Design Fee (resubmit) | $20 | Per residential/commercial unit |
| Truck Roll Fee | $85 | Set fee for extra vehicle trips, i.e. reinspection,meter verification, troubleshootingcustomer side, etc. |
| Dig-in/Damage Mobilization Fee | Graduated | $300 minimum, $1,000/hr. when outage exceeds 1 hr. |
| Temporary Meter Connection | $500 | Fee for new services that desire atemporary meter set |
| Meter Related Fees | ||
| Wire Pull (up to 400 amps) | $380 plus meter | Customer responsible for wire on serviceslarger than 400 amps |
| Meter Installation Fee – Single-Phase | $235 | All new meter issuances regardless of reason,does not include replacement meters. |
| Meter Installation Fee – Three-Phase | $470 | All new meter issuances regardless of reason,does not include replacement meters. |
| Meter Fee | Meter Cost Plus | Cost of Meter rounded up to nearest $10 |
| Meter – Nonstandard Meter – Monthly Meter Reading Charge | $20 | Typically those meters that must be manually read |
| Net Metering – Application Fee | $400 | Included in current schedule. |
| Device Fees | ||
| Generation Transfer Switch – Preliminary Inspection Fee | $100 | Verification trip for sizing and deviceappropriateness |
| Generation Transfer Switch – Installation Fee | $100 | Installation and meter re-installation |
| Outside Lighting (Yard Lights) | $7.50 per Month | Set fee regardless of consumption levels |
| Outside Lighting Maintenance | $25 plus parts |