Rates & Fees

Facitilies ChargeEnergy ChargeDemand Charge
Flat MonthlyPer kWhPer Peak kWh
Residential TOU Rates
Below 400 AMP$18.90$0.50
400 AMP & Greater$36.90$1.50
On-Peak$0.14029
Off-Peak$0.12199
Residential Block Rates (TOU Opt-Out)
Below 400 AMP$18.90$0.50
400 AMP & Greater$36.90$1.50
Block 1 (0-1000 kWh)$0.12007
Block 2 (>1000 kWh)$0.14438
Residential Net Metering Rates
Below 400 AMP$18.90$0.50
400 AMP & Greater$34.90$1.50
Non-Summer On-Peak$0.20625
Non-Summer Off-Peak$0.08250
Summer On-Peak$0.26667
SummerOff-Peak$0.10063
Residential Service Pumping Rates
All Customers$18.90$0.50
On-Peak$0.14029
Off-Peak$0.12199
Small General Service Rates
Single Phase$29.00$12.60
Three Phase$39.00$12.60
Block 1 (0-500 kWh)$0.07815
Block 2 (>500 kWh)$0.07034
Small General Service Pumping Rates
All Customers$44.50$9.85
Non-Summer On-Peak$0.12314
Non-Summer Off-Peak$0.06157
Summer On-Peak$0.15019
SummerOff-Peak$0.07510
Medium General Service Rates
All Customers$155.00$0.07048$14.95
Medium General Service Pumping Rates
All Customers$155.00$9.85
Non-Summer On-Peak$0.12314
Non-Summer Off-Peak$0.06157
Summer On-Peak$0.15019
SummerOff-Peak$0.07510
Large General Service Rates
All Customers$372.00$15.35
Non-Summer On-Peak$0.08199
Non-Summer Off-Peak$0.06073
Summer On-Peak$0.10000
SummerOff-Peak$0.07408
EV Charging
Level 2$155.00$8.71
Level 3$372.00$8.71
Non-Summer On-Peak$0.10194
Non-Summer Off-Peak$0.07551
Summer On-Peak$0.12433
SummerOff-Peak$0.09210
Clear Peaks Renewable Rate

Optional Rate for 100% Renewable Energy

  • Monthly Base Charge – Charged according to Rate Class
  • Energy Charge (All kWh) – $0.90 per 100 kWh Block
Fee Schedule
Fee DescriptionAmountComments
Billing/Office Fees
Convenience Fee3%Used on Impact Fee and Work Order credit card payments only.
Late Payment Charge(Compounded)1.50%Applied on any past due amounts
Returned Payment Charge$15Included in current schedule
Reconnect Fee$20Included in current schedule
Service Application Fee$20Included in current schedule
Seasonal Disconnect Fee$50Included in current schedule
Construction Fees
Impact FeeAmperage Calc.Included in current schedule
Line Extension/New Development – Installation/Additional DesignBid EstimateEstimate for Labor, Materials, and Overhead provided upon request
Initiation/Will Serve Fee$200Check only
Design Fee$300This is a per development phase fee
Design Fee (resubmit)$20Per residential/commercial unit
Truck Roll Fee$85Set fee for extra vehicle trips, i.e. reinspection,meter verification, troubleshootingcustomer side, etc.
Dig-in/Damage Mobilization FeeGraduated$300 minimum, $1,000/hr. when outage exceeds 1 hr.
Temporary Meter Connection$500Fee for new services that desire atemporary meter set
Meter Related Fees
Wire Pull (up to 400 amps)$380 plus meterCustomer responsible for wire on serviceslarger than 400 amps
Meter Installation Fee – Single-Phase$235All new meter issuances regardless of reason,does not include replacement meters.
Meter Installation Fee – Three-Phase$470All new meter issuances regardless of reason,does not include replacement meters.
Meter FeeMeter Cost PlusCost of Meter rounded up to nearest $10
Meter – Nonstandard Meter – Monthly Meter Reading Charge$20Typically those meters that must be manually read
Net Metering – Application Fee$400Included in current schedule.
Device Fees
Generation Transfer Switch – Preliminary Inspection Fee$100Verification trip for sizing and deviceappropriateness
Generation Transfer Switch – Installation Fee$100Installation and meter re-installation
Outside Lighting (Yard Lights)$7.50 per MonthSet fee regardless of consumption levels
Outside Lighting Maintenance$25 plus parts